Crew break charter for your project
Crews leaving and returning for the year-end break, mid-year stops and home leave for lodged workers, with planned schedules, backup drivers and 24-hour monitoring to the destination.

When to hire
Situations where MEGA handles crew travel so the project never stops.
Year-end break
The project stops between Christmas and New Year, and hundreds of workers need to get home and return on the agreed day.
Home leave for lodged workers
Workers who live far from the job site go home periodically, and every departure has to leave on time.
Mid-year stops
Scheduled stops that require many crews to travel at the same time.
Destinations across the country
One project with workers from several states, needing different routes, connections and modes.
From one job site to all of Brazil
During the crew break, each crew heads to its own city in the same plan: routes, times and modes agreed with the project.
How MEGA does it
Every operation starts from the client’s reality and follows the four steps of Humanology.

Planning with the project
Demand, schedules, routes, connections and vehicles defined together with the client, before any departure.

Boarding check
Every worker is checked against the list before boarding. No one is left behind.

Organization at the departure point
Crews, luggage and vehicles organized to leave on schedule.

Monitoring to the destination
Backup drivers, planned stops and 24-hour monitoring all the way to the destination.
What’s included
- Schedule and route planning with the project
- Every worker checked against the boarding list
- Backup drivers and planned stops
- 24-hour monitoring to the destination
- Bus, plane and boat combined when the route calls for it
- Full catering during the trip, if contracted
12 years of operation, since 201460k+ workers transported25 states plus the Federal District served
See an operation up close.
One of the largest logistics operations in Latin America. When you tap it, the video loads from YouTube.
Frequently asked questions
How far in advance should I book a crew break charter?
The sooner, the better. Schedules, routes and vehicles are defined together with the project, and demand for buses is high at year end. Send your request as soon as you have the stop date and the number of workers; our sales team will help with the rest.
What about the return to the job site after the break?
The return is part of the same plan: departure and return are agreed with the project so everyone arrives on schedule.
Can I send the list of destinations as a spreadsheet?
Yes. Attach the spreadsheet as Excel, CSV or PDF in the form on this page and the proposal is built from it.
Does MEGA operate outside the cities where it has bases?
Yes. The bases in Sinop, Altamira, Belém, Petrolina, Navegantes, Vitória, João Pessoa, Belo Horizonte and Teresina support crews in 25 states and the Federal District of Brazil.
Who looks after the trip?
The MEGA team checks boarding at departure and monitors the trip 24 hours a day, with backup drivers and planned stops.
Shall we move your crew?
Tell us about your project. MEGA’s sales team will reply with a tailored proposal.
Request sent.
MEGA’s sales team has received your information and will be in touch soon with your proposal.